恒彩彩票官网

上海业多实业有限公司
021-66713126
工程图展 PROJECT CASE
活动隔断综合参数Y&D Comprehensive Parameters of Y&D Movable Partition Wall 一、进入施工现场前本公司提供活动隔断样品,承诺所生产的产品与样品一致;严格按消防部门“建筑设计防火审核意见书”要求施工。所用材料需符合消防要求。 YEDUO will provide sample of movable partition wall before construction mobilization and promise the products are identical to the sample and construction is strictly in accordance with Fire Prevention Review Proposal for Architectural Design issued by fire department. All materials meet fire protection requirements. 二、根据甲方要求:规划装轨道期限及墙板制作时间和墙板吊装日期。 Schedule track installation, wallboard production and installation as required by Party A. 三、进场必须办理进场手续:安装人员带好身份证、安全帽、安全带,焊接人员带电焊操作证;灭火器、消防垫及水桶和焊条余量桶。配电箱交甲方办理出入证及电焊使用证;下班前检查现场关闭电源并提供材料合格证。打电锤时戴好防护镜;上脚手架前严格检查锁扣。承诺接受甲方安全作业指导和产品质量监督。 Go through mobilization formalities before mobilization; installer takes identity card, safety helmet and safety belt; welder takes operation certificate of electric welding, fire extinguisher, fire prevention mat, bucket and welding rod bucket. Distribution box shall be provided to Party A for making Pass Card and Use Permit of Electric Welding. Power off before going off duty; provide material certificate. Wear eye shield during electric hammer hit; carefully inspect the buckle before standing on the scaffold. Promise to accept Party A’s safety operation instruction and product quality supervision. 四、本公司现场负责人每天同甲方现场负责人沟通:及时掌握情况如 材料存放处及顶部焊接与下方错位操作;轨道与天花、墙板收口; Our Principal on site will communicate with Party A’s Principal on site to get known the site condition timely, such as material storage, staggered operation of top welding and below; connector between track and ceiling, wall board. 五、吊装墙板时密切协调:搬运路线、吊装支点; Closely coordinate delivery route and suspension point for wallboard. 六、墙板搬运到指定位置时要分布均匀,考虑到地坪负荷。同时保护好其它装饰好的产品 Wallboard shall be evenly placed on the site, considering the floor load; the other decoration products shall be well protected. 七、产品安装完毕后安装人员首先要自检、现场负责人复检后提交公司副总再检。由公司出具验收单提请甲方会同业主总检。 After product installation completes, installer shall make inspection firstly, site principal shall recheck and deputy general manager shall make a check again. YEDUO will issue inspection list for final inspection of Party A and Owner. 八、验收单签署后质保期免费回访和维保,接维保电话后保证及时二十四小时内迅速修复。 Conduct return visit and provide maintenance during warranty period and ensure to make repair within 24h upon receiving the phone call. 九、隔音阻断值:RW=50dB (以EN20140为准)根据同济大学隔声测试报告内部放置62Kg/m³隔音棉;边框内镶隔音胶条及吸声粘带。以DIN标准的K值0.668系数。水平密封接触压力为1500N;墙板侧面封边吸引力38N/m;吸引系数0.8密封胶条:拉伸强度≥8.15MPA 邵尔硬度65±3; Sound insulation value: RW=50dB (subject to EN20140); according to the sound insulation test report of Tongji University, place 62Kg/m³ sound insulation cotton inside and attach sound insulation adhesive tape and sound absorption tap in the frame. Taking K value at 0.668 per DIN standard, contact pressure of horizontal sealing is 1500N; attractive force of wallboard side edge sealing is 38N/m; attraction coefficient is 0.8; tensile strength of sealing strip is ≥8.15MPA; shore hardness is 65±3; 十、轨道型号配备(T6 抗拉强度≥180N/MPA)硬度(HV)≥69均符合GB/T6892-2000之标准。安装轨道上方铁架时一定要严格按本公司出具的施工图施工;做到等距、垂直(膨胀螺钳紧固度、焊缝塔迭度、每5米加固一左一右斜撑)钢架尺寸=【总高度(地面完成面到建筑顶面)减标高-180】 Track model (T6 tensile strength≥180N/MPA) and hardness (HV) ≥69 comply with standard GB/T6892-2000. Installation of iron above the track shall comply with construction drawing and ensure to be spaced equally and vertical (fastness of expansion bolt, overlapping of welding seam, adding diagonal bracing at right and left for every 5 meters); dimension of steel frame = [total height (F.F.L to ceiling) – elevation 180] 十一、安装轨道时铝合金翻边8mm处为标高吊顶点。即轨道底部尺寸到地面完成面尺寸为标高mm-8mm,水平误差率控制在±2mm;界面接缝无错位。 8mm upsiding down edge of aluminum alloy is suspended ceiling, that is, the dimension from track bottom to finished floor is elevation mm -8mm; Horizontal error rate is controlled at ±2mm; joint shall not be staggered. 十二、万向滑轮:加强型滑轮(选用自动转弯导向配合、预先准确设定;高强度滚珠轴承一体无焊接加工优于其它近似产品) Universal pulley: reinforced pulley (automatic turning, accurate pre-set, high strength ball bearing integration without welding, be superior to the similar product) 十三、厚度98mm 板材甲醛释放量达到国家E1标准。密度52Kg/㎡ 上下虚位30mm。墙板实际高度标高-60mm。 Formaldehyde emission of 98mm plate meets national E1 standard; density of wall board is 52Kg/㎡; up and below clearance of wallboard is 30mm; actual height of wallboard is 60mm. 十四、墙板表面装饰包时上下100mm处气钉长度不能大于装饰厚度+10mm及时和装饰方沟通,装饰面板一定不能超出基层板。配合好饰面收口问题。 Length of air nail 100mm up and below the wallboard veneer shall not be +10mm greater than the decoration thickness; timely communicate with customer; decoration panel shall not stretch out of the base board. Well treat the veneer binding. 十五、每组隔断由18片NE和2片TE组成。TE箱采用内伸缩:便于装饰及每片同样尺寸(是同行业中唯一研发的内装置) Each partition wall consists of 18 NE and 2 TE. TE cabinet is inside stretching out and drawing back to facilitate decoration and make each piece at the same dimension (the only inner device in this field) 十六、燃烧等级:B1级;防火时效大于60分钟。 Combustion grade is B1 and fire rating is more than 60m. 上海業多實業有限公司 Shanghai YEDUO Industrial Co., Ltd Tel.: 86-021*54106586 021*66713126 Fax: 86-021*66713128 Helpline: 13818821186 Website: www.activeliferunner.com Email: 759391299@qq.com
1上一页下一页6条/页 共
万发彩票官网 快3网上投注 乐游彩票 333彩票注册 快三投注 快3网上购买 江苏快3 辽宁11选5 快3投注 冠军彩票投注